You are here: RMS loads two heavy boilers
RMS loads two heavy boilers
Two heavy lift boilers were loaded on board the RMS in Walvis Bay on 3rd June (Voyage 115) on behalf of Gendev of Namibia Ltd. The boilers will be unloaded at Cape Town on 6th June. The lift was carried out by the Namibian Port Authority’s mobile crane.